Our challenge on the Torrens Road to River Torrens project in Adelaide was the management of its rail safety design.
Working with CPB Contractors, EIC Activities managed rail safety design for a rail over road grade separation by mapping the Rail Engineering Assurance process to the project’s road design and engineering management processes.
EIC Activities also narrowed the structure’s proposed design by 1.8m securing significant savings in materials and installation costs.